PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar mats for Elev. 1,2,3 (4th Floor) Facing East (800x600).jpg Excavation for the Tele-Data conecting the new building Facing South (800x600).jpg Pouring concrete at Stair -4 (3rd Floor) Facing Norht-East (800x600).jpg Saw cutting across Rahway Ave. Facing South(800x600).jpg Saw Cutting across Rahway view from the 2nd Floor (800x600).jpg Excavating across Rahway Ave. Facing North (800x600).jpg
Previous pageNext page Excavation for the Tele-Data conecting the new building Facing South (800x600)
Excavation for the Tele-Data conecting the new building Facing South (800x600)